Pool Progress Report
After lengthy supply delays, enough parts have arrived to complete the installation of the main electrical and gas line runs at the pool facility.
New main electrical feeds and two new 3-inch gas lines have been installed. The old pool was operating via a single 2-inch line. Also installed were new electrical mainline conduits.
Site power in conjunction with SCE is continuing this week, including



