• Start pool and spa ….
![• Start pool and spa …. • Start pool and spa ….](https://www.lwweekly.com/leisureworldweekly/news/wp-content/uploads/sites/2/2021/08/08f47b4deb71603ddb01fefcfc9c4285.jpg)
![• Start pool and spa …. • Start pool and spa ….](https://www.lwweekly.com/leisureworldweekly/news/wp-content/uploads/sites/2/2021/08/08f47b4deb71603ddb01fefcfc9c4285.jpg)
• Start pool and spa plumbing .
The pool has been closed since November 2019, when potentially catastropic defects were uncovered in the 1960s-era facility.
The project that started as a simple remodel soon morphed into a full-blown reconstruction in the name of safety.
The project coincided with the coronavirus epidemic, which has delayed construction, parts procurement and other facets of the job.
The facility will boast a pool with five swimming lanes, a 30-by-30-foot activity area with a volleyball net, a 9-by-25-foot spa, new locker rooms and a lounge area in a reconfigured space to maximize potential.